top of page
TIMELINE
The project is scheduled for 12 months, according to the following schedule:
A. Collection of dynamic metrics and indicators on the use of ESIF by region;
B. Collection of metrics and dynamic indicators of regional development;
C. Preparation of the databases that will support the subsequent analysis;
D. Assessment of the degree of correlation between the level of development and the ESIF;
E. Efficiency analysis in the use of ESIF;
​
F. Transformation of data and results from the previous points into tabular and/or graphical information;
G. Preparation of the final report;
H. Planning and implementation of actions for public dissemination of the study and its results.
bottom of page